Dry machine installation and debugging:
A, dry separator should be installed in a flat place, adjust the equipments according to the real situation of front-rear direction.
Second, the installed will, inject transmission oil, lubricating oil, adjust the firmness of triangle.
Third, the magnetic separator magnetic is transferred to the appropriate location. Check whether the magnetic separator is forward.
Four, follow the boot start the motor after feeding, the order of the downtime to stop feeding in downtime.
Five, the normal work, check daily maintenance and inject transmission oil, lubricating oil. Check the triangle of firmness.
Clean the magnetic separator tube skin surface adsorption iron pin, foreign body.
|